Hinkley Point Stage 2 Consultation Strategy (SOCC)
25 June 2010, 0.87Mb
Hinkley Point Statement of Community Consultation (SOCC)
25 June 2010, 0.43Mb
21 July 2010, 1.97Mb
- Navigation Document (0.9Mb)
- Preferred Proposals
- Masterplans
- Stage 1 Consultation
- Environmental Appraisal
- Environmental Appraisal: Summary (0.9Mb)
- Environmental Appraisal: Volume 1 (0.6Mb)
- Environmental Appraisal: Volume 2 (7.0Mb)*
- COMPLETE DOWNLOAD - Environmental Appraisal: Volume 2 (437.0Mb)
- Environmental Appraisal: Volume 3 Chapter 1 (0.2Mb)*
- Environmental Appraisal: Volume 3 Chapter 2 (0.2Mb)*
- Environmental Appraisal: Volume 3 Chapter 3 (0.2Mb)*
- Environmental Appraisal: Volume 3 Chapter 4 (0.2Mb)*
- Environmental Appraisal: Volume 3 Chapter 5 (0.2Mb)*
- Environmental Appraisal: Volume 3 Chapter 6 (0.2Mb)*
- Environmental Appraisal: Volume 3 Chapter 7 (0.2Mb)*
- Environmental Appraisal: Volume 3 Chapter 8 (0.2Mb)*
- COMPLETE DOWNLOAD - Environmental Appraisal: Volume 3 (442.0Mb)
- Environmental Appraisal: Volume 4 (0.5Mb)
- Transport Appraisal (7.5Mb)*
- COMPLETE DOWNLOAD - Transport Appraisal (12.8Mb)
- Proposed Travel Plan (19.6Mb)*
- COMPLETE DOWNLOAD - Proposed Travel Plan (38.2Mb)
- Flood Risk Study
- Flood Risk Study - Hinkley Point C and On-site Associated Development (128.6Mb)
- Flood Risk Study - Overarching Off-site Associated Development (6.7.0Mb)
- Flood Risk Study - Combwich Wharf and Freight Logistics Facility (18.6Mb)
- Flood Risk Study - Bridgwater A Accomodation Campus (40.7Mb)
- Flood Risk Study - Bridgwater C Accomodation Campus (17.3Mb)
- Flood Risk Study - Cannington Bypass (17.1Mb)
- Flood Risk Study - Cannington Park and Ride Facility (22.0Mb)
- Flood Risk Study - Williton Park and Ride Facility (9.3Mb)
- Flood Risk Study - Junction 23, M5, Freight Logistics and Park and Ride Facility (26.9Mb)
- Flood Risk Study - Junction 24, M5, Freight Logistics and Park and Ride Facility (7.8Mb)
- Flood Risk Study - Modelling (21.8Mb)
- Sustainability Evaluation (2.0Mb)
- Health Impact Appraisal (3.0Mb)
- Proposed Planning Requirements and Obligations (8.3Mb)*
- COMPLETE DOWNLOAD - Proposed Planning Requirements and Obligations (15.8Mb)
- Proposed Land Plans (3.0Mb)
Translated documents
Preferred Proposals Summary - Chinese
3 August 2011, 1.49Mb
Preferred Proposals Summary - Polish
3 August 2011, 10.14Mb
Preferred Proposals Summary - Portuguese
3 August 2011, 15.94Mb
Preferred Proposals Summary - Bengali
3 August 2011, 7.22Mb
Those links with an asterisk against them contain links and sub-menus to a number of further Stage 2 documents.
Some of these PDFs have been compressed and optimized for viewing on the internet. If you require higher resolution, uncompressed documents please contact us.