EDF - Hinkley Point

EDF Hinkley Point Home

Please see below for further information on our 'Proposed Changes to the Preferred Proposals including M5 Junction 24 and Highway Improvements in the Bridgwater Area' consultation:

Detailed designs for each improvement are still being discussed with the highway authorities. The red line plans show the maximum land area that might be required to facilitate these improvements – the actual area required may be less than shown. The red lines for the Somerfield site and the previously consulted on site near to J24 are also included.